S.No Location Scope of Work No. of issued TS Approved TS Cost (Rs.) Length (m) Physical Progress Financial Progress
01 Khuzdar FMIS 89 299,864,269 69,265.47 60% 52.43%
02 Khuzdar CAD 33 63,837,615 13,041.15 80% 59.32%
03 Zhob FMIS 84 243,794,152 50,215.43 85% 69.72%
04 Zhob (ZAPIS) CAD 9 17,913,150 2,910.00 100% 100%
05 Ahmedzai (Zhob) CAD 22 68,607,745 30,710.00 80% 70%
06 Killi Sardar (Zhob) FMIS 6 44,225,197 1,645.84 100% 100%
07 Killa Saifullah FMIS 97 327,466,469 72,654.18 100% 100%
08 Sherani FMIS 15 36,410,228 8,071.95 90% 59.95%

ZHOB RIVER BASIN

S.No Name Sub-Projects Total Estimated Cost Total Length of WC New Irrigated Command Improved Irrigated Command Area Total Command Area Khushkaba Farming Area Total
01 Ahmadzai PIS + FIS 16680 562.05 214.81 776.86 199 1027.86
02 Muslim Bagh Flood Dispersal / Sabakzai CAD 23908 1050 1050 1050
03 Siri Toi Dam 98277 4234 4234 361 8345
04 Kill Sardar Akhter PIS 5907 149 265 414 436
05 Farmers Managed PIS/FIS 117369 1710 1710 1710
06 Subtotal A 0 262141 4945.05 3239.81 8184.86 560 12568.86

MULA RIVER BASIN

S.No Name Sub-Projects Total Estimated Cost Total Length of WC New Irrigated Command Improved Irrigated Command Area Total Command Area Khushkaba Farming Area Total
01 Churri Infiltration Gallery 12232 694 115 809 350 1167
02 Pashta Khan & Garambowad PIS 20572 598 637 1235 50 1291
03 Kharkh Valley Development Scheme 62500 600 1714 2314 75 2599
04 Kharzan Hatachi Infiltration Gallery 25500 202 534 736 378 1199
05 Manyalo, Raiko & Rind Ali PIS 18900 419 257 676 425 1114
06 Farmers Managed PIS/FIS 160776 2213 2213 2213
07 Subtotal B 0 300480 2513 5470 7983 1278 9583
08 TOTAL 0 562621 7458.05 8709.81 16167.86 1838 22151.86