The scheme is located in district Khuzdar, about 50 km north-east of Khuzdar. Access to subproject site from Khuzdar is through M-8 motorway, which connects to a dirt road crossing Mula river basin boundary in, fair-weather on north-east side of M-8. The subproject consists of a weir with conveyance system and flood protection bunds at Manyalo for irrigating command area of 680 ha under cultivation out of which 314 ha is already under cultivation, while 366 ha will be additional command area. After construction of sub-project, 10 villages, namely Manyalo, Khair, Karrech , Raiko on right bank and Malki, Bhoko, Jakhar, saboz, Thatt and Rind Ali on left bank will come under cultivation.

Salient Features

S.NO
01 Contract Cost 1449.912 (Rs. Million)
02 Manyalo Weir L = 47 M and W= 400 M
03 Manyalo Right Channel Length 9263 Meter
04 Manyalo Left Channel Length 7110 Meter
05 Manyalo Raiko Channel Length 5800 Meter
06 Manyalo Rind Ali Channel Length 7110 Meter
07 Manyalo Protection Bund Total Length 1845 Meter
Project Progress
Physical Progress 33%
Financial Progress 27%
  • Contractor M/s ABCC-Ramzan & Sons
  • Commencement 2nd May 2023
  • Completion Date N/A