The Churri
Infiltration Gallery Subproject is designed to enhance irrigation efficiency
and ensure sustainable water use. It consists of three core components: (1) an Infiltration
Gallery constructed to capture and divert subsurface water, (2) Perennial
Channels developed to transport and distribute water reliably to agricultural
fields, and (3) a Protection Bund built to protect the system and nearby land
from floods, erosion, and other natural hazards. Together, these structures
improve water availability, agricultural productivity, and community resilience.
SALIENT FEATURES:
|
Total Cost |
801.14 million |
|
Length of Infiltration Gallery |
270 m |
|
Length of Main Canal |
4000 m |
|
Length of Branch Canal |
7150 m |
|
Command Area |
800 hectare |
PROJECT PROGRESS:
In progress