The
Ahmedzai sub-project comprises (i) main diversion weir across the stream Sawar
Rud-a tributary of Zhob River; (ii) perennial irrigation scheme along right
bank and (iii) the flood irrigation scheme along left bank. The Perennial
Irrigation Scheme (PIS) supplies water round the year whereas the Flood
Irrigation Scheme (FIS) supplies water to the agricultural land only during
floods when there is availability of surplus flows in the stream. Right and
left bank command areas of Ahmedzai sub-project will receive irrigation water
from perennial and flood flows respectively. The design of interventions
related to all components of this subproject. These are divided as, (i)
Irrigation Network – Rehabilitation and Lining. (ii) Flood Protection. and
(iii) Weir construction. The scope of work for the subproject include
remodeling of the existing Ahmadzai weir along with the rehabilitation and
partial lining of perennial and flood channels and associated structures.
SALIENT FEATURES:
|
Total Cost |
669.700 (Rs. Million) |
|
Contract Closed |
650.241 (Rs. Million) |
|
Total Command Area |
859 hector |
|
Ahmadzai Weir |
New Construction |
|
Perennial Canal Length |
3220 Meter |
|
Flood Channels Length |
3500 Meter |
PROJECT PROGRESS:
Completed