The proposed the intervention for the subproject include; (a) Construction of two infiltration galleries, (b) Construction and rehabilitation of water conveyance system and associated structures, (c) flood protection works for irrigation canals, construction of  project support facility building at khuzdar city and command area development works. The sub-project is aimed to rehabilitate and improve damaged infrastructure to enhance size of command area having irrigation facility.

WhatsApp-Image-2025-09-11-at-16.59.18-768x1024

SALIENT FEATURES:

Total Cost

1091.806 (Rs. Million)

Total Command Area

1144 hector

Infiltration Gallery

Total Length 1310 Meter

Conduit Length

Total Length 2983 Meter

Canals Length

Total Length 42,231 Meter

Flood Protection Bund (04 Nos.)

Total Length 7153 Meter

PROJECT PROGRESS:

Completed

WhatsApp-Image-2025-09-11-at-16.59.18-768x1024
WhatsApp-Image-2025-09-11-at-16.43.41
WhatsApp-Image-2025-08-29-at-17.01.45-1
WhatsApp-Image-2025-09-11-at-17.00.09-768x576
WhatsApp-Image-2025-08-29-at-17.01.45-3