The scheme is located in district Khuzdar, about 50 km north-east of Khuzdar. Access to subproject site from Khuzdar is through M-8 motorway, which connects to a dirt road crossing Mula river basin boundary in, fair-weather on north-east side of M-8. The subproject consists of a weir with conveyance system and flood protection bunds at Manyalo for irrigating command area of 680 ha under cultivation out of which 314 ha is already under cultivation, while 366 ha will be additional command area. After construction of sub-project, 10 villages, namely Manyalo, Khair, Karrech , Raiko on right bank and Malki, Bhoko, Jakhar, saboz, Thatt and Rind Ali on left bank will come under cultivation.

  SALIENT FEATURES:

Contract Cost 

1449.912 (Rs. Million)

Manyalo Weir

L = 47 M and W= 400 M

Manyalo Right Channel

Length 9263 Meter

Manyalo Left Channel

Length 7110 Meter

Manyalo Raiko Channel

Length 5800 Meter

Manyalo Rind Ali Channel

Length 7110 Meter

Manyalo Protection Bund

Total Length 1845 Meter

PROJECT PROGRESS:

Overall Target

70.00%

Physical Progress

15 %

Financial Progress

13.20%